News Digest (www.upstreamonline.com)
An uncontrolled gas release occurred from the KSG#76 well on the Kharsang oilfield in Arunachal Pradesh, India, following a blowout on 30 October during servicing operations. The well had been leaking for three weeks before the situation was brought under control.
Oil India Limited (OIL), supported by international specialist Cudd Well Contract and the field operator GeoEnpro Petroleum (GEPL), initiated a crisis management response on 1 November. The operation involved safely removing the damaged blowout preventer (BOP) from the wellhead. Following its removal, a pre-positioned capping stack was installed. This critical step securely redirected the gas flow to the top of the stack, ensuring full containment and control. The BOP was successfully closed on 22 November, effectively stopping the gas discharge.
The successful capping of the well was attributed to careful planning, technical expertise, and strong collaboration between global specialists and local teams.
The Kharsang oilfield is located in the Assam-Arakan basin, approximately 50 kilometres east of the Digboi refinery. Discovered 50 years ago by OIL, it was brought into commercial operation in 1983. The field is currently operated by a consortium led by GEPL under a production sharing contract. It currently produces oil from shallow reservoirs, and the partners have ongoing plans to develop deeper zones and enhance output through the drilling of new wells.
24 November 2025
This material is an AI-assisted summary based on publicly available sources and may contain inaccuracies. For the original and full details, please refer to the source link. Based on materials by Amanda Battersby. All rights to the original text and images remain with their respective rights holders.