News Digest (www.upstreamonline.com)
BW Offshore is advancing procurement for critical equipment for a large floating production, storage and offloading (FPSO) vessel destined for Equinor's Bay du Nord project offshore eastern Canada. The FPSO, with a capacity of 160,000 barrels per day, will be located in the Flemish Pass basin in 1,165 meters of water and is scheduled for operation in 2031.
The company has issued multiple expressions of interest for topsides and hull equipment. A central requirement across the procurements is the need for robust systems capable of operating in the project's harsh environment, which is prone to severe weather and icebergs.
The procurement inquiries cover several major systems:
6 January 2026
This material is an AI-assisted summary based on publicly available sources and may contain inaccuracies. For the original and full details, please refer to the source link. Based on materials by Iain Esau. All rights to the original text and images remain with their respective rights holders.