Connecting a DC to the production system
1.In the model tree, select the oil production system model previously created in the nv.AIM PIPE module.
2.For each "Well" object, open the "IPR" tab and link the previously created DC model (the relationship between reservoir pressure and cumulative oil production), and enter a reservoir pressure shift if needed.

